Asset Loads

How to run a Contaminated Box Move
During a job boxes may become contaminated and need to be transported to be dumped out from the well site to a terminal or another location. When assigned a...
Mon, Jan 8, 2024 at 11:16 AM
How to run a Full Box Move
During a job full boxes may have to be moved from the well site to a terminal or another location. When assigned a Full Box Move, the following steps should...
Mon, Jan 8, 2024 at 11:16 AM
How to run a Empty Box Move
During a job empty boxes may have to be moved from the well site to a terminal or another location. When assigned a Full Box Move, the following steps shoul...
Mon, Jan 8, 2024 at 11:16 AM
How to run a Equipment Move
During a job equipment may have to be moved from the well site to a terminal or another location. When assigned a Full Box Move, the following steps should ...
Mon, Jan 8, 2024 at 11:17 AM